Quantcast
Channel: Bangor Daily News Classifieds: Legals
Viewing all articles
Browse latest Browse all 12348

CITY OF BANGOR PUBLIC MEETING NOTICE

$
0
0
PUBLIC MEETING NOTICE With Spring quickly approaching, the City of Bangor and the Bangor Water District will soon be resuming work on the French, State, and Exchange Street Utility Upgrades Project. A public meeting will be held on Wednesday March 21, 2018 at 6:00 PM in Council Chambers located on the 3rd floor of City Hall. Representatives from the City of Bangor and the Bangor Water District will be available to discuss the construction project and answer questions. The project includes the installation of new sewer main, new storm drain, new catch basins and sanitary manholes, service laterals, new water main, hydrants, and services along approximately 1,000 linear feet on French Street, and all appurtenances, along with rebuilding the roadway and sidewalks and other incidental work. The project also includes installing new sewer main, new storm drain, new catch basins and sanitary manholes, service laterals, new water main, hydrants, and services, and new communication conduit along approximately 900 linear feet on State and Exchange Street, along with removing and resetting curbing, bricks, trench paving, surface restoration, and other incidental work. During construction of the new water lines, it will be necessary to shut down existing water mains in order to complete portions of the work, resulting in service interruptions. When a water service interruption affecting your property is scheduled, you will be notified at least 48 hours in advance; either by telephone or with a notice hung on the building's front door. Water outages will typically last between four and six hours, unless unforeseen circumstances arise. If there are extraordinary circumstances related to your building such that an outage of four to six hours or longer would cause an unmanageable hardship, please contact the District Engineer for the Bangor Water District at 207-947-4516 x 440 as soon as possible. Construction is scheduled to resume in early spring of 2018 as weather permits and continue into the late fall of 2018. During periods of construction, traffic may be detoured, and night work will be required at some locations. The City and Water District encourage residents, business owners, and users of French Street, Exchange Street, and State Street within the construction area to attend this meeting. March 17, 2018

Viewing all articles
Browse latest Browse all 12348

Latest Images

Trending Articles



Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>